03.04.2026, 14:34
MOSCOW. April 3 (Interfax) - Scheduled preventative work was conducted on the Power of Siberia gas pipeline between March 26 and April 3, Gazprom said.
To read the full news articles, Subscribe.
01:36PM
Kazakhstan to conduct seismic surveys in two oil-and-gas prospective basins over next three years